Laserfiche WebLink
MCCrosse� Sepa -,MCCrossen Sepa <br /> a. would the project result in an increased need for public services (for example: <br /> fire pro- <br /> tection, police protection, health care, schools, other)? if so, generally <br /> describe. <br /> NO <br /> b. Proposed measures to reduce ar contral direct impacts on public services, if <br /> any. <br /> NONE <br /> 16. utilities <br /> a. Circle utilities currently availahle at the sdte: electricity, natural gas, <br /> water, refuse serv- <br /> ice, telephone, sanitary sewer, septic system, other. <br /> None at this time , all utilities will be capped off at curb side <br /> b. Describe the utilities that are proposed for the project, the utility providing <br /> the service, <br /> and the general construction activities on the site or in the immediate vicinity <br /> which mi ght <br /> be needed. <br /> NA <br /> . SIGNATURE <br /> C <br /> The above answers are true and complete to the best of my knowledge. i understand <br /> that the lead <br /> gency is relying on them to make its decision. <br /> a <br /> ignature: <br /> . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . <br /> . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . <br /> 5 <br /> Page 16,Iq <br />