My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1922 HEWITT AVE 2016-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
1922
>
1922 HEWITT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 8:41:44 AM
Creation date
2/20/2017 8:41:17 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
1922
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�9�2 Nav�h q o�' �3 <br /> 12. FLOO,�,ING <br /> Install new resilient vinyl sheet goods in all kitchens <br /> and bathrooms and in the laundr roo as shown in the <br /> floor plans ovei new 3 8" hig ens ty particle board <br /> underlayment. Nail underlayment to existing flooring 6" <br /> O.C. at edges and 8" O.C. elsewhere using ring shank <br /> nails. Fill edges and feather all uneven joints with <br /> Fix-all or equal. Apply flooring according to <br /> manufacturer's installations instructions using approved <br /> adhesive. Clean all vinyl floors at completion of the <br /> work. Material allowance for new vinyl: $14 per square <br /> yard retail. Owner choice of color and style of new <br /> floorinq. <br /> Install new carpet on �il areas of the residential floor <br /> (except the floor of. unit 8 and all areas to receive new <br /> vinyl flooring) an3 on the floor of the hallway and on <br /> the main atairway from the etreet. Re ove a e i <br /> tjgi B nd st r� Re lace ad a d t t Th a <br /> contract : nclude re-atretch ng necessary within <br /> one year of completion of the contract. Provide tack <br /> strips at petimeter of all areas to ceceive new carpet. <br /> Install -3f9+► 1 " rebond type pad to al� areas to be ' <br /> carpeted. Pr�v de chrome plated edge bars at all <br /> junctions with vinyl floorin9, at threaholds of entry <br /> doors to each unit, and at the foot of the stairs to the <br /> street. Material allovrance for new carpet: S16 per <br /> square yard cetail in each residential unit and ;20 per <br /> aquare yard retail on the hallway and stairs. Owner <br /> choice of color and style of new carpet: Carpet . <br /> nylon, atatic free type in hall and on stairs. _ <br /> Tear up wood floorin9 at street entry area to <br /> residential atairs on the north aide of the building. <br /> Install new framing and underlayment as necessary to <br /> support 2" concrete floor. Pour concrete, exposed <br /> agqregate, fluah with adjacent flooring. <br /> a <br /> 13. CAHI,�IBTS AND COUNTER�P <br /> Install new kitchen cabinets as ahown in the drawings. <br /> Cab3net doora : fluah birch plywood. Other standarda : <br /> Pay 'N Pak "Contemporary" or equal. Inatall level and <br /> � true, secured to solid backing with sccews. <br /> Inatall new countertops over all nev kitchen base <br /> cabinets. Onderlayment . 3/4" high density particle <br /> board. Spline all joints. Screw countertops to base <br /> cabinets. Install high pressure plastic laminate over <br /> underlayment, owner choice of color and style. Extend <br /> laminate 4• up wall and trim with aluminum laminate <br /> trim. Inatall wood self edge and cover with laminate. <br /> Sand all rough edges and clean when installation is <br /> complete. <br /> �11 11 J L L��� �Lt��a� �t �t��—�l �- � <br /> Inatall new counterto in laundr room o h west wall <br /> sout o door. ( isresard n drawing_ laYo�t)_. __Support <br /> afth 3 knee brackel-s to wali� 36" above flo4r _ L�ngLh�: <br /> 6 ' 0" . Standards as above includi_na _ self_ edae and <br /> backs las <br />
The URL can be used to link to this page
Your browser does not support the video tag.