My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 HEWITT AVE EVERETT EVENT CENTER 2018-01-01 MF Import
>
Address Records
>
HEWITT AVE
>
2000
>
EVERETT EVENT CENTER
>
2000 HEWITT AVE EVERETT EVENT CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 11:04:25 AM
Creation date
2/20/2017 8:45:55 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2000
Tenant Name
EVERETT EVENT CENTER
Notes
VISITORS BUREAU
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1045
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � 3 �-, <br /> Anchor Capacities and Lrngths <br /> Individual anchor loads are developed from the design esith pressurc diagrams prcsrnted <br /> on the drawings, using a tributazy area method to assign loads to .he individual anchors <br /> and to the toe shear in the piles. Anchor lengths aze then deten�ined from the naload <br /> zone (see llrawings) and the required bond zone. The length of the bond zone is <br /> determined &om the anchor design load and tt�e allowable pullout value. 'Ihe pullout <br /> values have ban determined based on an assessment of the predominant materials within <br /> which anchorage cecws. For the very dense native soils in which anchorage will be <br /> developed, an allowable pullout resistance of 3 kips per foot has bern used for desi;n. <br /> Mchor capacities and lengths are provided for each anchor in Table 1. <br /> Soldier Piles <br /> Soldier pile loadings are detecmined from the design earth pressure diagrams and the <br /> location and inclinations of the anchots. The spmadsheet output prcsented in Table 1 <br /> summarius the following design aspects: <br /> • Calculation of soldier pile loads and bending moments, consistrnt with the design <br /> apparent earth pressure diagrams provided on the Drawings. For each soldier <br /> pile, thc csl�ulated axial loed and bending moment are provided for each pile <br /> segment, startin6 with the upper cantileva and proceeding from the top to the <br /> bottom of the pile <br /> • Pile structural steel sizin� in accordance with the AISC (1989) Allowable Stress <br /> Design Specification, 9 Edition. Combined flezune and axial load, shear, and <br /> compact section steel design checks are perfoTmed for the critically loaded <br /> section of each pile along the length of the wall. The spreadsheet output <br /> summarizes the minimum steel section required for each pile segment and <br /> identifies the pile size required to support the most adverse loading condition. <br /> Mchor-Pile Connections <br /> The design of the connection of the anchors to the soldier piles is summariud in Table 2. <br /> Required weld lengths a�d connection plate sizes were determined in accordance with the <br /> 9'" Edition AISC (1989) ?�SD Specification and for ASTM A36 steol and E70XX weld <br /> electrodes. <br /> 3.4 Timber Lagging <br /> Timber lagging, spanning between adjacent piles, will also be used to support the soil. The <br /> average design earth pressures for the lagging are indicated in Table 1, and these design earth <br /> pressures aze derived directly from the design earth pressure diagrams. Table 3 shows that 4 <br /> inch lasging is adequate. <br /> 3.5 Wall Drainage <br /> The timbet lagging fa_ing will be placed with 'h-inch spaces between adjacrnt lagging <br /> boazds. '1'hereCore, drainage board will not be provided behind the wall. Drain board will be <br /> attached to the front of the wood lagging,as part of the permanent wall drainage system. <br /> Ground Support PLLC `�' <br />
The URL can be used to link to this page
Your browser does not support the video tag.