Laserfiche WebLink
The Keebel Company,Iec. <br /> 9122 169th Avenue Northeast <br /> � Granite Falis, WA 98252 <br /> (360)691-5910 <br /> February 18,2002 <br /> Pete Cooper <br /> City of Everett <br /> 3101 Cedar Street <br /> Everett,Washington 98201 <br /> RE: inspection proposal for the building located at 2008 Hewitt Avenue,Everett, WA, <br /> Dear Mr. Cooper, <br /> The Knebel Company submits the foUowing cost proposal for an inspection of suspoct <br /> asbestos and lead,and PCB containing building materials affecting the demolition of the <br /> building located at 2008 Hewitt Avenua, Everett,WA. <br /> 7'his cost proposai includes sample extraction, sample analysis,and report generation. <br /> The reports submitted will include sample results,a description of each material <br /> sampl� ',the location of each sample taken,an assessment of asbestos containing <br /> materials, quantiry of asbestos conteining material,and the lab and inspector <br /> accreditation. <br /> Asbestos Sample analysis(regular) 46 samples @ 530.00 per sample 51,380.00 <br /> Lead paint sample analysis(�egular) 5 samples @ 530.00 per sample Sl 50.00 <br /> Sample Collection and walkrlaraugh) ]0 hours @ $o:i.00 /hour 5650.00 <br /> TCLP for lead 1 sample @ S100.00 per semple 5100.00 <br /> Report Generation 14 hours @ $50.00 /hour 5700.00 <br /> TOTAL S2,9B0.00 <br /> Please call me with questions or comments. (360)691-5910 <br /> Sincer� <br /> �..��� <br /> _�_ / <br /> � Sara Knebel <br /> (President) <br /> i <br />