Laserfiche WebLink
g <br /> f <br /> ��� I <br /> . � � <br /> 6�A�A� <br /> October 20, 1978 � <br /> AR 78-194 4 <br /> � <br /> � <br /> I <br /> PRELIMINART COST ESTIMATE FOR COMPLETE � <br /> SOUTH ELEVATION REMODEL TO INDUSTRIAL ELECTRIC BUILDING i <br /> EVERETT, WASHINGTON � <br /> I <br /> Item No.l Demolition•- Lump Sum E 1 ,500.00 ! <br /> I <br /> Item No.2 Concrete Foundation <br /> Approximately 8 c.y. @ 550.00 400.00 , <br /> Item No.3 New Brick Wall ' <br /> A proximately 750 s ft. @ $4.50 3,375.00 � <br /> P q: <br /> Item No.S COR-TEN Metal Facia ' <br /> Approximately 1 ,100 sq.ft. @ �3.90 4,290.00 i <br /> Item No.5 Nater-Proof Gyp Wall Board •, <br /> ' Approximately 1 ,100 sq.ft. @ $ .75 825.00 , <br /> i. <br /> Item No.6 Operable Aluminum Frame Windows <br /> Approximately 24 @ E60.00 1 ,440.00 i; <br /> Item No.7 Levolor Blinds �• <br /> Approximately 24 @ $35.00 840.00 <br /> Item No.B New Door k <br /> �, 1 @ $300.00 300.00 <br /> Item No.9 Miscellaneous Wood Trim - Lum9 Sum _ 200.00 <br /> 513,170.00 <br /> Elpi�k!eis A¢hiiects P/anners Surveyors <br /> 19655 I91h Ave.N.E.Sealue. WF 98755.(206)362688d/Everefi?59-6071 <br />