Laserfiche WebLink
Date_2)12k <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Public Wodu M 1 • / { 7 � <br />Blop. on. •-LS�Qii� <br />Public Works Fee <br />Total Fee <br />Less AppL Fee Paid <br />Balance Due >{ <br />Phone <br />t•none <br />Describe Proposed Work <br />Project Address (if known) <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines a Centerline of street <br />e Outline and dimensions of all existing and a Indicate North <br />proposed structures oi, the lot a Show any proposed grading changes <br />e Existing and proposed utilities a Show measurements <br />PERMIT CONDITIONS <br />1. All calls for inspection shell be made 24 hrs in advance - phone 259.8815. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specification& <br />3. Call Location Underground Service 48 hrs. before ycu dig. TOLL FREE NUMBER 1.800-424.5555. <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />W <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259-8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />O <br />M2 <br />z <br />O <br />O <br />Q <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of Installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />