Laserfiche WebLink
INSPECTION REPORT-�p���� <br />Date%� % Perrnitl r <br />Contractor: <br />7V Owner: <br />!Site Address: <br />TYPE OF INSPECTIO EOUESTED <br />ELECTRICAL BUILDING MECHANICAL PLUMBING <br />❑ Temp Service ❑ LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br />' ❑ Groundwork ❑ Fooling ❑ Rough In ❑ Rough In <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ OK to insulate <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ Water Service <br />❑ Insulation ❑ Mechanical Final ❑ Medical Gas <br />d ❑ Drywall Nailing ❑ PI•imbing Final <br />ISITEE <br />Final ❑ Shear NailingGAS PIPE <br />❑ Roof Nailing ❑ Rough In/Service Hot Water Tank <br />in ❑ Ceiling Grid ❑ Refrigeration ❑ Rough In <br />❑ Roof drains ❑ Building Final G., ❑ Gas Pipe Final ElHWT Final <br />OTHER OR CONSULTATION: '-� Q/ 51,5 <br />❑APPROVAL ❑ PARTIAL APPROVAL FINALAPPROVAL THIS PERMIT <br />❑ OK FOR TC.O. ❑ CORRECTION REOUESTFD <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL ((425) 257.8881 FOR REINSPECTION • 24 hour notice required <br />t <br />I . <br />inspecto Date: <br />EIR 14109) �=N^��m ,�n rvnw nw a.n i,.• <br />