Laserfiche WebLink
INSPECTION REPORT � <br />Address�s�� /��`� ""`� <br />Contractor <br />Owner '�� �� <br />- �— <br />Date <br />�PROVAL ❑ PARTIAL APPROVAL� <br />U VIOLATION ❑ CORRECTION REQUESTED <br />U Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange tor appointment. <br />7 Was mt able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. . � <br />Inspector Date ��� <br />S ECTION RE�UESTED � �� <br />J Tea�6 Elect. ❑ aming J Gas Piping � <br />�'footing , ❑ Drywall, Nailin9 U Consultalion <br />0 Foundation '] Shear Nailing ❑ Groundwork <br />❑ Ductwork ❑ Grid :] Struct. 51ab <br />❑ Wood Stove Cl Rough-in O Final <br />'�J Masonry .] Service ❑ Insulation <br />� Other_ <br />LDG: Pml. No. � MECH: Pmt. No. <br />� ELEC: Pmt. No. ❑ PLBG: PmL No. <br />