Laserfiche WebLink
.� <br />CIASED CM WORK ORDERS REPORT <br />Total Utility Maintenance Manaqement System <br />05/04/1994 Paqe 1 <br />ass�eaaaneavasa�vva:aaaasvesveev=a=cv=eeve--�-veaasa=vvaaae=�xvevmasaaasa:i:na <br />Date Ranqe :04/O1/1992 - 04/30/1994 <br />CM Work Order Ranqe :<Blank> - 8405421080229 Pattern :7401196648076 <br />Item Ranqe :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />ss�a:sssavaee=aaaeasaaass�:s�aee�aeeeee=eeas��aaeasaavvs:e�ma-acasasevaa:a:�s:o <br />CM WORK ORDER ID: 7401196648076 Title: SO .75 INCH 2520 HIGHLAND AVE <br />Item ID: -- <br />Location ID: Activity 664 <br />Proqram 740 Function 119 <br />Date Con�pleted: 04/25/1994 <br />Ov4ra11 Craft: <br />Issued: 04/25/1994 <br />out of Service? NO <br />Mater Reading: <br />Downtime: 0 hours <br />status: <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Laior: <br />Craft ID Name __ Planned Hra Actual Hrs <br />----- ------ ----------- <br />----------------- ----------- -------- <br />UL LMA LIBBING, MAURICE A. 0.00 3 00 <br />UL NSO NIEISEN, SCOTT 0. 0.00 3.00 <br />WST WDT WALDEN, DAROLD T. 0.00 3.00 <br />Materials: <br />ID <br />I►DAP34000547 <br />HOX000056247 <br />CORP34001847 <br />COUP34004647 <br />METE36089447 <br />PIPE34060647 <br />S11DD40014747 <br />SETT34033647 <br />WIRE00119847 <br />Vehicles: <br />ID <br />V2139 <br />V2146 <br />V3505 <br />Description <br />ADAPTER 3/4^ MIP X INSTA-TITE@ <br />SOX METER PLA 15" X 10" YI%LID <br />CORP STOP 3/4" CCT X INSTA @ <br />COUPLING 3/4" ANG MET X FIP @ <br />METER 5/8" * NO REMOTE READER <br />PIPE 3/4" POLY I.P•S. <br />SERVICE SADDLE 3" W/3/4" CCT <br />SETTER COP 5/8^ X 3/4" LGTH15" <br />TRACING WIRE 10 GAUGE <br />Description <br />SVC TRUCK CHEV 86 <br />SVC TRUCK CHEV 87 <br />BI►CRfiOE CASE 82 <br />Total Labor Cost: <br />Date <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />04/25/1994 <br />�j Used <br />---- 1 <br />1 <br />1 <br />1 <br />1 <br />13 <br />1 <br />1 <br />14 <br />Total Material Cost: <br />Date Hours <br />04/25/1994 3.00 <br />04/25/1994 3.00 <br />04/25/1994 3.00 <br />Total Vehicle Cost: <br />__ Cost___ <br />41.04 <br />43.05 <br />54.96 <br />139 05 <br />Cost <br />------8.11 <br />13.49 <br />15.76 <br />4.27 <br />27.21 <br />3.25 <br />7.68 <br />47.78 <br />1.12 <br />----128 67 <br />Cost <br />15.30 <br />15.60 <br />51.90 <br />-----82.80 <br />Work Description: ----- <br />-------------------------------------------------------- <br />