Laserfiche WebLink
PY/6LK WVYPiCS <br />April 6, 2001 <br />Prime Equipment <br />3409 Everett Ave <br />Everett, WA 98201 <br />RE: REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY <br />Job Address: 2810 Highland Ave <br />Permits: B0003-035 (2nd story addition) <br />B0011.006 (canopy) <br />Last inspection: January 29, 2001 <br />Issuance of a Certificate of Occupancy for improvements under these permits is being helm for <br />completion of worst on the canopy. An inspection for final approval of the canopy in January <br />resulted in requested corrections (see copy of report enclosed). Please request Final inspection <br />when corrections have been completed,-, that we may issue a Certificate of Occupancy for your <br />project. <br />Please call our office at (425) 257-8810 within the next 10 days to schedule inspection, or if you have <br />questions or believe our records are in error. Thank you for your assistance in meeting the final <br />requirements for closing out this file. <br />Sincerely, , <br />M��cLeod <br />Building Division <br />cc: Premium Construction Group <br />12014 20th St SE <br />Everett, WA 98201 <br />Prime Equipment <br />2810 Highland Ave. <br />Everett, WA 98201 <br />CITY OF EVERETT• 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8856 <br />