My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2810 HIGHLAND AVE 2018-01-02 MF Import
>
Address Records
>
HIGHLAND AVE
>
2810
>
2810 HIGHLAND AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 2:56:54 PM
Creation date
2/20/2017 9:28:30 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND AVE
Street Number
2810
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt x %(oc7 31� <br />Cost of Work Order <br />1,427.00 <br />taabik Works Deparbeent <br />Utilities Division, 3200 Cadar Street <br />Everett, Washington 98201 <br />(425) 2574M <br />Date Paid a OD <br />Work Order M <br />Cost of Service Order Service Order M <br />Contact Person Telephone M 259.6108 <br />Requested By Paul McKee Date of Request 7-17-W <br />Property Owner (name) Prime Equipment <br />Charge -Cost to (name if different than owner) <br />Address 2810 Highland City Everett Zip 98201 <br />Installation Location Calif 3 Summit North East comer <br />Installation type/description/size/etc. 8" hot tap and flnel connection. Contractor to expose existing 8". <br />City to make tap and install control valve and make final connection. Contractor will do all baekfill end <br />restoration. Temporary double check to be supplied and installed by contractor until purity Is <br />obtained. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notitr the City of Evereft Utilities Division 10 workint days in advance of reaulred installation date to <br />allow for schedulint and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment renal and <br />administrative casts, the deficit shall be charged to the property for whkb such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applyipg for the Installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERSEAND LARGER MAYHAVEA 5IX TO 10 WEEKLEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />TOTAL <br />*NOTE: Hot tap and final connection only. <br />ti <br />Prepared by: C <br />Accepted by: _ <br />C.9MP.E"'(L%Vr1A101 <br />1,075.00 <br />216.00 <br />136.00 <br />$1,427.00• <br />Date Est. <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Robert Weddle <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Prepared: I Representing: <br />of_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.