Laserfiche WebLink
• CLOBBD Q[ 1POR1C ORDERS REpORT <br />Total Utility Maintenance Management Syatem <br />_ 02/13/1996 Page 1 <br />aea:a::saaaazx:vvexzvecvcv_e�ocavasseaaasve=e=c=ssvexceeeoeeeoeee <br />Date Range :O1/09/1989 - 02/09/1996 ---�-�'�'� <br />CM Work Order Range :1001091070001 - UT2608- - Pattern :7101196750520 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />a:s'ass�'axsssaaasxaassass��saeva=xa::veamasavxvca-eaxees=ev_e <br />sxeeoas'ax'=av::sm <br />CM WORK ORDER ID: 7101196750520 Title: RENEW ,75 INCH 6424 HIGHLAND DR <br />«DUPLICATE PRINTING OF PHIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 02/02/1996 <br />Overall Craft: <br />Iaeued: 11/17/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 houra <br />Status: <br />1fat�rial� : <br />ID <br />ADAP34000347 <br />COUP34003847 <br />COUP34004347 <br />PIPE34060647 <br />WIRE00119847 <br />Ieaued by: G7 Aaeigned to: GJ <br />Priority: Travel Time: 0.00 Hr. <br />Deacription <br />------------------------------ <br />ADAPTER 3/4" CST X INSTA-TITE� <br />COUPLING 3/4" 3PC COP X COP @ <br />COUPLING 3/4" MIP X COP ELL Q <br />PIPE 3/4" POLY I.P.S. <br />TRACING WIRE 10 GAUGE <br />Date <br />11/17/1995 <br />11/17/1995 <br />11/17/1995 <br />11/17/1995 <br />11/17/1995 <br /># Uaed <br />---2 <br />1 <br />1 <br />2 <br />2 <br />Total Material Coat: <br />Coet <br />15.22 <br />4.17 <br />3.85 <br />0.52 <br />0.20 <br />23.96 <br />Work Deacription: <br />-------------------------------------------------------------------------------- <br />REF. WATER MAIN CONSTRUCTION WO# 710-119-673-0125 <br />• THIS WO IS A CARRY OVER FROM 1995. T!iE TOTAL MATERIAL DOLLAR AMOUNT IS <br />FOR 1995 FROM INVENTORY $ 23.96 <br />Total cost for work order 7101196750520: 23.96 <br />