Laserfiche WebLink
Date��� <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />Public Worke Perm� <br />Blap. Oept. • <br />PuEi�c Wprkn Fee <br />Tolel Fee S <br />Less Appl Fee PaiE S <br />Balence Oue i <br />Phone <br />Applicant Mailing Adtlress City Zip Phone <br />Describe Proposed Work <br />Prolect Adtlress (il known) <br />Attach lour (4) copies of plans for proposed work • Oraw to <br />• Property Lines <br />• Outline and dimensions af ell existing and <br />proposed structures on the lot <br />• Existing and proposed utilities <br />nole the following as applicable: <br />• Centerline ot street <br />• Indicate North <br />• Show any proposed grading rhanges <br />• Show measurements <br />PERMIT CONDITIONS <br />1. All cslle for Inspection ahell be made 24 hrs in advence - phone 259�8814. <br />2. All work ehall be pertormed in accordance with this permit and current City of Everett Design and Constructlon <br />Standarda and Speclfications. <br />3. Call Location Underground Service 48 hrs, bafore you dig. TOLI FREE NUMBER 1$00-424•5555. <br />�� �.�� <br />�J� � <br />n,� <br />g ,�-88 <br />lor Construction <br />Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPFRTMENT <br />� 3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259•8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />� <br />� <br />� <br />0 <br />a <br />The undersigned owner/applicant hereby agrees to hold and save herm- <br />less the City of Everett irom any and all claims lor dameges, costs. <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other righl-of•way use hereto <br />applied for and further agrees to remove same upon notice irom the <br />City and to rep�ace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED 8Y THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PEFDAIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAV BE <br />CANCELLED BY THE CITY UPOY ANY STOPPAGE OF WORK ON THIS <br />PRO.IECT OVER 90 DAYE D'Jr7ATION. <br />