Laserfiche WebLink
COMPWINCE <br />REOUIRED <br />INsr[crotr �MPORTANT: Supply Iniotmatlon In the aheded area by checklnp tFa approprlate clrcles.. <br />�PPA�� Dlsrepard topla thet don't descrlbe your bulldinp or equlpmeM. �Q.'[ place checks In <br />the two lett columns. <br />0�� <br />� <br />u <br />FOUNDATION PHASE <br />WSEC Foundation phase �equlrements: <br />Inspected by: oate J <br />FRAM!!VG PNASE <br />p aQ All structural panels such as plywood, particle board, wafer board, and orierrted strand board shali be <br />labled • EXPOSURE I"EXTERIOR' or'HUD -APPROVED" (VIAO, S. 401.1). <br />❑ Q Insulatlon baHles shall be placed in altfcs/ceilings to maiMain at least 1"ventilatbn space and extend at <br />least 6" vertically above batts or 12" vertkally above bosefill insulation (S. 502.1.4.5). <br />� <br />SyrtlbolS USCd: _ �qual+ <br />Page 2 ot 6 <br />> yroater than <less than a O��er than or pwl t Nu than or eqwl <br />UPDATE09ERTEMBER1Y91 <br />