Laserfiche WebLink
h <br />� <br />CL088D Qt *,�►pg� OgDgg3 RBPORT � <br />Total Utility Maintenance Management System <br />::::::..::.::::_---- �3�03/1998 <br />----�___________�====a�z=====____�--_--_--_-- PaJe 1 <br />Date Ranqe :01/09/1989 - 02/27/1998 -- <br />CM Work Order Ran 2 x� s_====�s�====_- <br />Item Range ;�gla�� °0810800810001 - UT2g30-30-322Pattern :7101196730277 <br />Program .-�LL - �3694L05 Pattern : * <br />Function ALI, A�tivity ALL <br />::s:::a::aa��s:avsaam�a��vQ�avas�esaaavva:ssvaeavev�xvav"v <br />CM WORK ORDfiR ID: 7101196730277 T1C7.E: _===::e��z�=3z�z�____ <br />«DUPLICATB pRIIVTING OF THIS WORK ORDER»�PAIR 6714 HIGHLAATD DR <br />Item ID: WMI,0685R03 -- WATER MAIN LINE <br />Location ID: <br />Program 710 Function 119 <br />Date Completed: 02/13/1998 Activity 673 <br />Overall Craft: <br />Iaeued: 02/09/1998 <br />out of service? NO <br />Meter Reading: <br />Downtime: 0 houra <br />Status: <br />Labor: <br />Craft ID <br />WST AGE <br />HEO BJC <br />EO EJA <br />�+ HLF <br />EO � <br />DLI p� <br />�+ SWU <br />Mat�rial�: <br />ID <br />CLAM44030147 <br />N/A <br />V�hicl��: <br />ID <br />V2139------- <br />V2201 <br />V2221 <br />VH0009 <br />Iasued by: WMW Asaigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />----------- <br />------------------- <br />I+LLEN, GARY E. <br />B�HNERT, JAMES C. <br />ELLIOTT, JAMES A. <br />HUSBY, LARRY FRANK <br />KARELSEN, ADOLPHUS E. IV <br />PUGH, CAMgRON W. <br />STENSETii, WOB URT <br />Description <br />------------- <br />CLAPiP REPAIR 6" BELL JOINT---- <br />TOP COARSE <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual_Hra <br />2.00 <br />14.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />14.00 <br />Total Labor Cost: <br />Date # Uaed <br />-------- <br />-------i <br />02/13/1998 <br />02/13/1998 2 <br />Total Material Cost: <br />Deacription <br />------------------ Houra <br />86 CHEV 1-TON W/HyD. UNIT ---- ------ <br />91 FLATBED 2-TON W/PATCH KING 14.00 <br />87 FORD 3yD Z•00 <br />97 CAT BACKHOE 2•00 <br />4.00 <br />Total Vehicle Cost: <br />cost <br />67.20 <br />64.00 <br />18.28 <br />113.60 <br />263.08 <br />---Cost_-- <br />44.16 <br />296.80 <br />39.62 <br />30.48 <br />39.32 <br />18.00 <br />230.72 <br />699.10 <br />___Coat___ <br />85.42 <br />27.76 <br />113.18 <br />�` <br />BS.+i,'� <br />Total cost for work order 7101196730277; <br />1075.36 <br />