Laserfiche WebLink
�_ <br />c <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plen dated <br />5. Connecf side sewer per City Standerd #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainege system provided for this lot. <br />�Rooftop runoff must be discharged to a roof downspout infiltration system per City o} Everett <br />Storm Manual 3-2.6.2. Width 3', Depth �_S; Length �. <br />10. The contractor must meet with the Public Works Inspector to discuss potenHal drainage <br />routing prior to beginning the project. <br />11 Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Standards for small parcels <br />�-�. Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Pian #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be repiaced). <br />16. Install a Type I concrete driveway per Ciry of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PWComments <br />Z%L <br />