Laserfiche WebLink
COST ESTIIVIATE SHEET <br />Receipt # ��57/� <br />✓. Cost of V�'ork Order 5,128.00 <br />Cost of Service Order <br />ContactPerson Debra Beuschlein <br />Requeseed By Gordon Witcher <br />Properry Owner (name) Concept Construct(on _ <br />Charge Cost ro(name if different than owner) <br />Address 15321 Broadway <br />Installation Location `�� N <br />Installation type/description/sizdetc. <br />Public works Depar�wt <br />Utllities Division, 3200 Cedar ShYet <br />Everett, R'aslilngton 98201 <br />(42� 257-8800 <br />DatePaid ��-a-qg <br />Work Order # <br />Service Onder # <br />Telephone # 425 486-1946 <br />Date of Request 10-11-99 <br />Ciry Snohomish Zip 98296 <br />#2. Hydrant installation. Expose 6" in Highland. Hot tap, install <br />contral valve and box, trench and install 20' (t). 6" DI pipe, 4" bury hydrant w/stortz port and thrust' <br />blocks. Restore asphalt and concrete. Do with #1, ii possible. <br />� The following estimate is based upon the Utilities Division providing all.labor, equipment, materials, <br />iestoradon, and final hook-up. <br />Whenevv the estiwted cost b not sutfldent to corer the tofal acpense tor Irbor, autetial, eqaipment renfal and <br />administndve costr, t6e dettcit shall be charged to t6e property for whicL tucL lmtallatlon wa� m�de and the owoer <br />thereot, and provided tY�rther, that any excess payment s6all be returned to the person apply[ng for the iastallation. <br />"Depos(t must be pald prior to ordeting parts or scheduling work. <br />WATER METER53"AND LARGER MAYHAVEA SlX TO 10 WEEKLEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />TOTAL <br />Prepared by: <br />Accepred by:� <br />au�:��oNiuiaivsv� <br />2,842.00 <br />1,620.00 <br />666.00 <br />as,�se.00 <br />Date Est. <br />Preoared: <br />cc: Bldg. Permit Center <br />Cleir Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representing: <br />