Laserfiche WebLink
3 <br />f <br />Pus�ic woRKs <br />PERMIT <br />PUBLIC WORKS DEPARTMENT <br />320n Cedar Street <br />Everetl, W.4 98207 <br />(425) 257-BB70 <br />t0 POSTING FEB= <br />ADAIR ENTERPRISES <br />'17032 35TH AVE SE <br />BOTHELL WA <br />PHONE: (Q2S�%43-17.LH <br />TAX PARCEL I.D. k <br />LLC <br />98012 <br />DESCRIPTIONOF NEW HOUSE - RASIC 21b0 <br />PROPOSED WORK: <br />PW <br />PERMtT CONDITIONS <br />Date 08/17/2001 <br />Public Works Pcrmil a PWO10£i-016 <br />Building Pcrmil k <br />Planning Relerence a <br />Public Works Pee 5 <br />Guarantee S <br />�.DAIR ENTERPRISES <br />17032 35TH AVE SE <br />BOTHELL WA <br />PHONE: (Q25�7�]3-1%I$ <br />C0108-L05 <br />$25.00 <br />LLC �98012 <br />PROJECTADDRESS:6•�24 HIGHLAND DR <br />1. All calls for inspection sha�l be made 24 hours in advance • phone (425) 257-B810 <br />2. All work shall be perlormed in accordance with this permil and current City ol Everett Design and Construction <br />Standards and Specifications. <br />3. Call Localion Underground Service 48 hrs. be(ore you dig. TOLL FREE NUMBER 1-800-424-5555 <br />4. Tiaht.line downspouts to storm systcm. <br />,, r�-,nnerr side sewer per city standard GO1. <br />'% � <br />_ �;�� ��k-�,[�-o.L <br />Appm� i: r ronsiruclion_ Daie <br />, / <br />�{. �� c:: y�---'_.. �� � %' �=. <br />J FINAL INSPECTI�N <br />Approvetl as Consimct� d Dale <br />ACKNOWLEDG[MENT OF CONDITIONS <br />W <br />� <br />'.�^ <br />V/ <br />W <br />O <br />� <br />Z <br />O <br />r/� <br />V/ <br />O <br />a <br />The undersi�ned ownedapplicant hereby agrees to hold and <br />save harmless iha Ciry ot Everett from any and all claims tor <br />damages, costs, eapenses, or causes of action that may arise <br />because ol installation and maintenanco ot the impmvement or <br />other righl•obway use hereto applietl for and fudher agrees to <br />remove same upon notico Irom ihe Cily and to replace public <br />property damaged Iherehy. <br />��a� \—�(J 3I OI <br />Signature Appllcam Daie <br />Y.; �RK AUTHO(iIZED DY THIS PERAiIT MUST BE STARTF.�� WITHIN 180. AYS OF OATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED <br />TO :OMPLETION. THIS FEfIMIT MAY BE CANCELLED BY THE CIiY UPOI l ANY STOPPAGE OP WORK ON THIS PRO+:.CT OVER 90 DAYS DURATION. <br />