Laserfiche WebLink
� <br />�-��I„'l� 2 <br />cirr oF EVE�r� <br />BU/LD/NG D/L//5/ON <br />3200 CEOAR ST. EYERETT, fN.O 9820/ (206) 259-BB/O <br />About this form: This torm isn't as involved as ri tooks, because you only use portions of k for a paAicular <br />dwellfng project. Instead of spending tine searching through the WSEC, this tortn wtli heip organfze and <br />�oondense the requirements that appiy to your proJed. It is also an excellem.tool for Ieaming the residentia! <br />WSEC requiremeMs. <br />Requirements are grouped by foundation, framing, insulation, and flnal inspection phases. This nut oniy <br />lets you know what you need to do but also when the Inspector will be checking for parttcular <br />requiremems. Use ihe tortn to choose complfance options that best suft the economics and design of your <br />project. , <br />A designated department energy specialist can help you wilh your questions. This form will help you <br />comply with the WSEC as quidcly and painlessly as possible. <br />Rosponslbllity for Intormetlon: Although stalf inembers wlll heip you with general questions about <br />completing 2his torm, it is ultimately your responsibility to provide detalled fnformation about heating <br />systems, glazing, insulation, and other build(ng speciticatfons. ee sure to get prior approval from the <br />Department if you later wfsh to make changes in your project. For more requirement detail, refer to the <br />Washinglon State Energy Code,1991 Edition. <br />3� Pape 1, Complience Optlons: Select one compliance option at the top of thS table. <br />q Pages 2 through 6, in.the shaded hox areas nnlv: Provide iniormatbn and chedc circles that apply to <br />' your speciiic proJect. �Otp�ac�narks fn the two leit side columns Iabeled "GOMPLIANCE REuUIRED" <br />and 'INSPECTION APPROVED" or in boxes bcated in non-shaded areas (These are tor department use). <br />Since this lorm will be evaluated for compieteness and accuracy, you can avoid unecessary pertnit delays <br />by carefuliy providing all required iniormation. You may disregard Rems that don't address your particular <br />buiidfng or equipmeM. <br />5 Compllance responslblllty: This torm will ultimately be used for all WSEC field inspections. When it is <br />retumed wfth your pertnit, reievant boxes under the "COMPLIANCE REQUIRED" column will have been <br />chedced by the Building Department. This denotes which WSEC requirements apply to your proJect. The <br />inspector wUl inspect your dwelling against these checked items and, when deemed acceptable, place a <br />second checkin the "INSPECTION APPROVED" coiumn. <br />All Residential Occupancies <br />OTHER heat source �GaS, oil, propane, wood, heat pumps) <br />KEN McCALUSTER CG��i3T, <br />P.O. BOX 3406 <br />L EVERETT. WA 98203 <br />