Laserfiche WebLink
eea. %j idtcta.i B 4JJm aW' '7"' <br />PROJECT: RAM Enterprises <br />DATE: 7128/81 <br />COST ESTIMATE <br />JOB NO. RO-20RA__ <br />SHEET �_ OF 1 <br />ITEM <br />DESCRIPTION <br />ESTIMATED <br />UNIT <br />UNIT <br />AMOUNT _ <br />1 <br />8" D.I. Water Main <br />590 <br />L.F. <br />11.70 <br />6,903.00 <br />2 <br />8" M.J. Gate valve <br />„ „ M-,l. Reducer <br />1 <br />1 <br />Ea. <br />Ea.. <br />442.00 <br />216.00 <br />442.00 <br />216.00 <br />4 <br />Water Service Transfer <br />11 <br />Ea. <br />110.00 <br />1,210.00 <br />n of Pavement <br />328 <br />S.Y. <br />6.60 <br />2,164.80 <br />SUB TOTAL <br />10,935.80 <br />5.3% Tax <br />-j79.60 <br />TOTAI <br />r <br />• r� <br />z <br />, <br />C, q T LOB 1+ <br />FGlSTV <br />r <br />T <br />