My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5631 HIGHWAY PL 2018-01-02 MF Import
>
Address Records
>
HIGHWAY PL
>
5631
>
5631 HIGHWAY PL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2022 3:36:07 PM
Creation date
2/20/2017 9:40:59 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5631
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. <br />f <br />Applic,--, with any other projects within tht .;ity of Everett currently <br />occupied without formal acceptance (signed Occupancy Permit) by <br />the City shall not be privileged to have a Latecomers Agreement <br />1� <br />processed. (For the purpose of enforcement: Applicant shall mean <br />any persons) or business(s) or corporation(s) or combination thereof, <br />having a current or past interest in a project that is illegally occupied, <br />including, contractors, consultant firms, owners, occupants, or operators. <br />(� <br />12. <br />The appropriate utility master record shall be posted with the assessment <br />Epps <br />notice on each parcel. <br />13. <br />The Building Official shall collect the assessment fee prior to issuing <br />the applicable utility connection. The assessment shall be paid prior <br />13LZ6 <br />to temporary connections where temporary applications are received <br />Qefrr- <br />prior to final connection permits. <br />ji <br />14. <br />The City Treasurer shall deposit the funds in the appropriate trust <br />account. <br />15. <br />A refund check will then be sent to the original applicant as designated <br />for <br />on the original application, at a time appropriate and convenient <br />the City to do so, except not later than 60 days after receipt of the <br />funds. Funds, undeliverable 3 years after expiration of the contract <br />shall be refunded to the party that paid them. In the event funds still <br />remain undeliverable, they will inure to the appropriate utility fund. <br />N <br />16. <br />All appropriate records to be posted. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.