Laserfiche WebLink
everett <br />� <br />INSPECTION REPORT <br />...- i�i ��i, �.._� <br />. . ✓ ._',�� / .r� <br />/ � � � <br />• �Q � �,� <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. C MECH: Pmt. No. <br />/�`\�t LEC: Pmt. No. ��❑ PLBG: PmL No. <br />❑ Temp. Elect. <br />❑ Footing <br />❑ Foundation <br />❑ Ductwork <br />❑ Wood Stove <br />❑ Masonry <br />❑ Framing <br />❑ Drywall, Nailing <br />❑ Shear Nailing <br />❑ Grid <br />�Rough•In <br />❑ Service <br />❑ Gas Piping <br />�Consultation <br />❑ Groundwork <br />❑ Struct. Slab <br />❑ Final <br />❑ <br />�PPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION � CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to pertorm inspection. <br />❑ CALL 259•8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspeclor <br />