Laserfiche WebLink
everett <br />e <br />INSPECTION REPORT <br />, <br />� . . . . • ::: . • <br />Contractor <br />Owner �!' �U> � ! �( IQL�'(.� <br />Date I(— � O' 8"% <br />7YPE OF INSPE�TION REQUESTED <br />❑ BLOG: Pml. No. ❑ MECH: Pml. No. <br />❑ ELEC: Pmt. No. �1 PLBG: Pmt. No. I�ZSZ <br />❑ Temp. Elect. ❑ Framing O Gas Piping <br />rJ Footing ❑ Drywall, Nailing ❑ Cr,nsultation <br />❑ Foundetion ❑ Shear Nailing O Groundwork <br />❑ Ductwork ❑ Grid � Struct. Slab <br />❑ Wood Stove ❑ Rough-In �:Final <br />❑ Masonry ❑ Service ❑ <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION �CORRECTION REQUIRED <br />❑ Corrections listed below MUST B� MADF before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />Was not able to pertorm inspection. <br />CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A RTIF��C;CUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Date� �/ 3 4� <br />