Laserfiche WebLink
TO Ken Callahan, Build.ag Dept. <br />FROM Ron Cameron , wti <br />DATE 9-5-80 <br />SUBJECT House on Highway Place <br />S L N 01) 1980 <br />CITY ATTORNEY'S OFFICE <br />CITY OF EVERETT, EVENEIT WASHINGTON <br />The only way to move the house with existing labor availability <br />is to remove the roof. The width and length of the house, <br />considered with the route to Lowell, indicate that the move <br />with the roof removed will require extraordinary review prior <br />to approval. <br />I reviewed the move with our crew and the City of Seattle Traffic <br />staff responsible for house move approvals. Seattle would only <br />approve the move with the roof cut off, but do approve some a,.crl.�-7 <br />moves where removing the roof (hzilght obstruction) is impossible <br />by scheduling signal removal and replacement. Signal removal <br />and replacement would cause major disservice at this time including <br />the new school signals on Colby and 19 SE. The roof of this <br />house would be required to be removed in Seattle. A move of this <br />house can only be approved tlith a roof removal and route review. <br />f^ e <br />coo <br />'� 1 M <br />• <br />( L. t 3 <br />It <br />40/ I ieiepnonect U Returned your call ❑ came In <br />❑ Will Cell a0al_"- a/ye return the CEII ❑See me <br />r <br />Message:_.,., 4�i SpZ�/.... <br />/J .......... <br />Phone: ' Date C_ 9_ <br />—y�%1imC <br />, <br />0 <br />