My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5717 HIGHWAY PL 2018-01-02 MF Import
>
Address Records
>
HIGHWAY PL
>
5717
>
5717 HIGHWAY PL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 10:43:05 AM
Creation date
2/20/2017 9:42:12 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5717
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE SHEET <br />Receipt # <br />Public Works Department <br />Utilities Division, 3200 Cedar Street <br />Lc- E_ n Everett, Washington 98201 <br />I� V �C (425)257-8800 <br />5 E P 3 0 2003 Date Paid /D - 9— 03 <br />Cost of Work Order Work Order # <br />✓ TT <br />Cost of Service Order r B E/c /8ervices Service Order # <br />C�7,. <br />Contact Person d+m tdorgan f/Yl.2gckAo /4/v ' Telephone # <br />425 355-2436 <br />Requested By Gordon Witcher Date of Request 9-16.03 <br />Property Owner (name) <br />Charge Cost to (name if different than owner) <br />Address 7423 Beverly Blvd City Everett Zip 98203 <br />Installation Location 5717 Highway PI <br />Installation type/description/size/ctc. 2-2" fire services w/DCDA in vaults for bldg 1 & 2. Tap existing <br />main, cross Highway Place, install DCDA's in vaults, make provisions for domestic services. Backfill <br />and restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />Please notifv the Citv of Everett Utilities Division 10 workinn_days in advance of required installation date to <br />allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the owner <br />thereof, and provided further, that any excess payment shall be returned to the person applying for the installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3"AND LARGER MAYHAVEA SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />Prepared by: Gerry Crum <br />Accepted by: <br />5:4Commonel<nuLCm� a,.Moq+n DOC <br />6,863.00 <br />2,786.00 <br />838.00 <br />184.00 <br />$10,671.00 <br />Date Est. <br />Prepared: <br />9-26-03 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />titan Welborn <br />Paul McKee <br />Gerry Crum <br />Alan Locke <br />Representing: <br />
The URL can be used to link to this page
Your browser does not support the video tag.