Laserfiche WebLink
13.--r0i.I.�U �.�AIdiGuEtdTS: <br />All pipes and drains shall have been laid through or across the <br />area to be occupied by the embankments; and their trenches thoroughly <br />and completely backfilled and :onsolida`.,ed. <br />The area �viihin the location �f tne embankments shall,--after <br />having been cleared, gruUbed, and stri�.oed of all �oil or ear�h con- <br />taining vegetable mould or other perishable suost�nces,--be thoroughly <br />ploughed to a depth of about si:: (6) inches, in furrowa parallel to <br />the axis of the e;nbankment. <br />The best ef the material from the excavations of the reservoir <br />basin shall be used to form the rolled embank�tents shotm on the plans. <br />No earth containing vegetable or other perishable material shall be <br />used iu any of the rolled embanlanents. All�. rocks and stones �•rhich <br />are large enough to prevent the proper spreading or compactiug of the <br />earth shall be remo�ed, In rolled embankment tne earth shall be spread <br />in horizontal layers of not more than four inches thickness, and each <br />layer shall re thoroughly compa,;ted by rolling tivith a roller rrhich shall <br />be equal in effc±ctiveness to a standard t;�elve ton steam road roller <br />having a groovea front rolll. The roller shall be passed not 2ess than <br />four. times over the enti;e a.rea of each four inch layer of earth, and <br />rolling shall be continued until the layer is thoroughly compacted. The <br />earth shall be sprinkled if necessary to secure a requisite amount of <br />moisture. The above �oes not anply to embanionent from waste excavation, <br />14.-�!9ASTE EV�AIdICh4F1dTS: <br />All excess excasation shall be i�ayteci in embanlrnients to li�ies <br />and gradea a3 sho���n on plans or as ypecifi ed by the t7ater Superinten�ient. <br />The area covered by this embanl.ment shall be cleared as herein specified, <br />V/aste Banks r:ill be made ksrel with top of �eservoir. <br />15•--E'CPLOSNES PROHI�ITED: <br />The use of exploeives, to assist or expedite the excavation, lvith <br />in the area ewbraced by the excavations or embanffinents for tlie Re�er- <br />voir, is pruhibited; eacept a wriiten special permit is granted Uy th� <br />�Aater Superintenden t, <br />16 . --PAYniEN1T : <br />The earthwork as herein s�ec.ified, ��:�ill be paid for at the rate <br />bid, per cuUic yar.? for "�;cavation" :neasureG in excavation; and per <br />cubic yard for "Rclled ESnbank;nent" ;,ieasured in embanlanent; except as <br />otherwise stipul�.ted for Pipe iine Trench, and except as Elsewhere <br />�ti�ulated, <br />7. <br />i � .va�� , •.;;, , . ..,;,. � , �a;��;� <br />