My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6110 HIGHWAY PL 2016-01-01 MF Import
>
Address Records
>
HIGHWAY PL
>
6110
>
6110 HIGHWAY PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 2:33:22 PM
Creation date
2/20/2017 9:44:06 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
6110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The concrete .ribs shall be thoroughly cleaned off, and � _oaper <br />laid ther�on as per plans. <br />After mixing. concrete shall be deposited rapidly upun the subg <br />grade to the reQuired depth. and f6r the entire width of the slab. in <br />B��essive batches, and in a continuous operation without the use of <br />intermediate £orms or bulkheade between expanaion jointa, <br />Coiscrete tivill not be allowed to be spou�ed� <br />In case of a breakdo�vn concrete shallbe mixed by har►d to complete <br />the section. T}ie r�aking of a joint except on tYie rfba as spec;fied and <br />that�neededato�completelatsgctionhatlthe�sto � concrete in excies of <br />used. The sta.rting of a slab before the noonpiour�and�thensfinishingbe <br />$tartE3�sit ha�setonbencomp2etely�finished in�aicontinuous operation. <br />Once a slab ia <br />Otherwlae the slab will }iave to be remoned and replace d z,ith a nem <br />elab, at Contractor's expense� <br />especialacare�ehall tie atcaliitimes r�equiredtto concrete water-tight <br />uniform conaistency. and to have it thoro Bet it of t'�e proper <br />uBhly worked over. <br />of juet thegr ght�coneistency,$�ae�y1conereteithatlis notiof justrthis <br />right consieteqcy, will be Tejected. Concrete shall always be laid up <br />hill. <br />On account of Che extra work required to pouring the slabs on the <br />elopes of the basl�s. two sets of rodders, spellin� each other will be <br />furnfahed if requeeted by h/ater Superintendent. <br />Ti�t ,joints are of prime iraportance� and the sides of alI slab� <br />shall be thoroughly spaded, so that tivhen thg forms are removed. con- <br />crete will ehow a emooth, denae face. If found neceaeary in orde# to <br />prevent pits and por.kets on the face, pater guperintendertt will require <br />on�the�floor of�thetlreaervofr willpnot�equire�� gxpected that the slabs <br />through spading, but that the slabs on the slopes�wiligre uirenly <br />aleo. at least in placea. 9 grouting <br />48.-_F ZNI3HI4iiG: <br />Surfac e ahall be struck off by a heavy template,. or atrike board, <br />wicich ehall be moved with a aomtiined tamping crosswie�e and longitudinal <br />mo•tion to produce a eurface free from depressions or unequalities of any <br />kind, F,a►en the strike board ie �+ithin threa ( j) feet af ajoint it shall <br />be lifted to the joint and the surface struck by moving the strike board <br />av►ay from the �oint; any exceas concrete shall be remo vpd, <br />21. <br />
The URL can be used to link to this page
Your browser does not support the video tag.