My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6110 HIGHWAY PL 2016-01-01 MF Import
>
Address Records
>
HIGHWAY PL
>
6110
>
6110 HIGHWAY PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 2:33:22 PM
Creation date
2/20/2017 9:44:06 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
6110
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMi ..� <br />At jointa, a suitable lpn6 handle split fToat of design satie- <br />factnrY ta the 1Yater Superintendent� notched in the center to allow <br />for'the expansion 3oint filler, shall be worked at right angles to the <br />joint to insure that the concrete on both sides of the �oint is at the <br />same elevation. Be�inning at the center of the sla.b and working to- <br />ward each edge the surplus concrete left by the strike board shall be <br />strept off, producind a uniform surface on roth sides of the joint. <br />48a--Wood Joint Fillers: <br />When 2� v slabs a.re <br />laid, temporary wood joint fillrra. accurately made to confoxm to the <br />size of joinLe shown on drawings. of suitable good lumber, shali be <br />placed at the joints. Especlal care shall be taken so no cement geta <br />between thie wood filler and the concrete in place. <br />Concrete shail be laid againat thie filler. As soon as Conorete <br />hae become eufficiently hard. this filier ahall De lifted out� andany <br />defeote in the concrete face remedied, and any ooncrete under neath the <br />filler removed. and the filler lightly replaced� and left in place until <br />auch tirne as the a�phalt �oint is poured. These wood jointi fillera will <br />be paid for at tYie rate bid per lineal foot of "Fxpansion Joint" completc <br />in plac e. <br />q9,-_CURING AND PAOTECTDON: <br />The aurSace of the slabs ehall be spraygd with water as soon as <br />i;he concrete ia aufficiently hardened to prevent pitting� and shall be <br />kept continuoFfsly wet for at least ten (10) days. As soon as the Con- <br />crete ie eufficiently hardened, canvas or burlap shall be laid on it, <br />and remain there and be kept continuouaTy v�et, until an approved <br />covering is placed or ponding. or mech.anical spraying has been estab- <br />lished. Farth covering wi22 not be peratitted. �5hen deemed necessary <br />or advisable by the Water Superintendent,'freshly laid concrete ahall <br />be protected by manvas until elab can be sprinkled: The canvas not <br />being laid on the conereter but sha11 be supported over the concreteby <br />light portable fraraes. <br />In order to protect the conerete as specif ied herein. the Contract- <br />or ahall provide svith eaCtt and every mixer on the job, a suffict�tt <br />ameunt of canvas or burlap to cover fi£ty (50) per cent oS the slaba <br />laid 1n any one maximwn day. The canvas or burlap shall be made up in <br />sheets sufficiently large for one'sheet to fullyr cover a whole slab. <br />This canvas or burlap shall be re�erved exclusively for the protection <br />of the slatis; and all canvas for tlie protec�t ion of cement piles, ete. <br />s:�all be in addiL3on to the amoun� specified above. <br />22, <br />
The URL can be used to link to this page
Your browser does not support the video tag.