Laserfiche WebLink
2.--The top finishing course of 1: 2 nortar Nllall be laid on the <br />base course before the concrete has be�un to set, ar.d never longer <br />than fifteen (15) ;.iinutes after the base course is in place. It shall <br />be struck and sa1•�ed off vith a suitable steel shod teraplate satis_ <br />factory to the 1Va ter Sunerintendent, and �hall be steel floated and <br />steel troweled to a compact, uniforn surface, Tree from depressions or <br />inequalities of any kind, <br />The top finishing course of 1: 2 mortar must be machine mixed, <br />conforming in all re^pects to the specifications for mixing coneretee <br />hereinbefore given. <br />Placing and finishin� the top course of slabs shall conform in all <br />respects to the specifications for the bottom course of slabs, except <br />as hereinbefore differe7tly specified� <br />�' "pAn��T�-The unit price bid per cubic yard for Class "�" Con- <br />crete and for Two Course Conerete in slabs covering ;.fembrane Lining <br />on Reaervoir Floor, complete in place. shall be full compensation for <br />furnishing all materials, and all labor incidental to placing� Curing <br />and protecting the concrete top course linin� slabs, except as speeially <br />aeparately bid for Expansion Joints; <br />2��. <br />