My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3306 HILL AVE 2016-01-01 MF Import
>
Address Records
>
HILL AVE
>
3306
>
3306 HILL AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 6:04:38 PM
Creation date
2/20/2017 9:46:08 AM
Metadata
Fields
Template:
Address Document
Street Name
HILL AVE
Street Number
3306
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Kalisen Strouse Ishihara <br />�� <br />f <br />18 January ��000 <br />i <br />8teve Miller �. <br />City of Everett uilding Department <br />3200 Cedar Stre t <br />Everett WA 9820 1 <br />Tel 425-257-881.0 <br />We submit two <br />revisions to pre� <br />listed: <br />1. Omit stair <br />Mezzanine <br />7/4, and 8 <br />The Seattle Tlmes <br />rett Distribution Facility <br />Hill Avenue, Everett 98206 <br />C 9912-015 <br />of construc�ion documents bearing proposed <br />approved building permit. The changes aze as <br />guardrail at existing Mezzanine #201. (Revise <br />plan 1/2, Main Floor Plan 3/2, omit details 5/4, <br />2. Add drinkingi fountain outside toilet rooms. (Revise Main Floor <br />plan 3/2, spe�c 15400). <br />3. Omit floor dr.ain at new Toilet Room # 105. (Revise Main Floor <br />plan 3/2, spe:c 15400). <br />4. Reverse the plan at new Toilet Room #105; place plumbing <br />fixtures along doubled east wall. (Revise Main Floor plan 3/2). <br />5. Omit new fac i1lUes within existing Toilet Room # 101. ExisUng <br />fixtures to ren.iain. (Revise Main Floor plan 3/2). <br />6. Reduce soutl:ierly roll-up door to 11' wide; change steel tube <br />intermediate j:amb to 6" X 12" T'S. Omit glazing and insulation at <br />both roll-up doors. (Revise Main Floor plan 3/2, Partial East <br />Elevation 2/2, detsils 3/3 and 9/3). <br />7. Reduce new metal canopy to 24'-0" wide, centered over roll-up <br />doors. (Revise Main Floor plan 3/2 and Partial East Elevation <br />2/2). <br />KSI Architecture & Planning A Protessior.nl Service <br />
The URL can be used to link to this page
Your browser does not support the video tag.