Laserfiche WebLink
Date.�•� <br />Appiication For <br />PUBLIC WORKS PERMIT _: _., , <br />Print or Type Only <br />Mailing <br />Address <br />� <br />Pu�Lc Works Permn + <br />BItlp.Oept.+ � li <br />Publicl9o�kaPee S <br />lotal Fee <br />Less AOD� Fee Paitl S <br />Belence Uue S <br />� <br />Phone <br />Describe Proposed Work �� ���--� �A I � 1� i� �_� Y�r,��S� �� �4 )l�i� <br />Project Address (if known) <br />Attach four (4) copies of plans for proposed work • Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline :�d dimensions of all ezisting and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Ezistlng and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All cells tor inspection shall be made 24 hrs in advance • phone 259•8615. <br />2. All work shall be pertormed in accordance with Ihis permit and current City of Everett Design and Construction <br />Standards and Specifications <br />3. Cell Locatian Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1•800•424•5555. <br />,�-�'F.��r �o� :� i�-F�9 <br />�//.�'G/C Cc�o/'.FS -f� �7u��,n �� . <br />�A� <br />r <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />� 3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259-8815 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />W <br />H <br />� <br />M <br />�� <br />� <br />� <br />O <br />� <br />� <br />O <br />a <br />The undersigned owner/applicant hereby agrees to hold end save harm• <br />less the City of Everet; from any and all claims for damages, costs, <br />expenses, or cau�a^ of action that may arise because of installetion <br />and maintenance of the improvement or olher right-of•way use hereto <br />applied for and further agrees to remove seme upon notice from tha <br />City and to replace public property demaged thereby. <br />Signature of Applicant Date <br />WORK AUTHOflIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />