Laserfiche WebLink
1 <br />� � , ., <br />� j � � ��—��i �6 <br />To 1Tarvin C. Haglund, Director of Utiliti S�� <br />,� �E �c.� �s� [ G � H, <br />%�� Roy VanDerl([eersche, Water Supt, y���aig Thom son, Sewer Supt. <br />�/ � ��/,! Z7 <br />Tt September 30, 1977 � <br />S�a�E�T D�LAftATION OF NON-SIGNIFICANCE - c,Tv oF EVERF.TT. [VENETT. WASHINGTON <br />Construct 7,300 squaz�e foot warehouse - <br />3324 Spruce Street. <br />WATER: <br />There is a 6" cast iron looped water main�on tlie east side oF Spruce Street with <br />approximately 98 psi pressure to supply this location. There is an existing fire <br />hydrant at the S. E. corner_of_33scLand Cedar (Spruce) streets. The construction <br />of the warehouse will�ot have a signif�t' impact on the water system. The ^/ <br />Water Departmeni shouid'i'iave no objections to the proposal. � 1�' <br />SE�NER: <br />� i� <br />There are two sewers in front of the subject property. One is the 42" intercep or <br />which does ha've at least one direct side sewer connection to it in this vicinity. The <br />other, which has the majority of the individual connection is an 8" main which is <br />not intercepted and which,(irains directly into the 3Gth Street overflow line which in <br />turn drains directly into the. river. Since we did not allow the County tranafer <br />stations to connect a new facility into an overflow line, I don't see how we can allow <br />this new facility to dr�iri direetly into the river I would therefore recommend <br />that they be made to tie into the 42" �n� c p or with their sewer. <br />DR,AINAGE: <br />Drainage can be connected to either main and due to the property's proximity to the <br />interceptor system or the river, there should not be a significant impact even if <br />detention is not provided. � <br />D ����l�`� �y� <br />l�: pCT - 51q77 � <br />_ ...... <br />....� <br />CITY 0( EVERETT <br />[i�f:ineering DePt. <br />% <br />�� <br />