Laserfiche WebLink
Date(�,�"�� <br />Applir.ation For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />2 <br />Applicant <br />Describe Proposed Work � Y`t S g � t' Cl Ul�i�,�� ('i ✓L. <br />Project Address (if known) <br />--. <br />PubLc Worxs Pe�mit r <br />Bltlg. Dep�. + <br />PublicWorksFee $ <br />Total Fee <br />Lase AOP� Fee PaiE S <br />Balenca Due S <br />Attech lour (4) copies ot plans lor proposed work - Draw to scaie and note Ihe following as applicable: <br />• Property Lines .• Centerline of street <br />• Outline and dimensions of a�l existiny and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />PERMIT CONDITIONS <br />1. All calls lor inspection shall be mede 24 hrs in advance - phone 259•881 5. <br />2. All work shall he performed in accordence with this permit and current City of Everett Design and Conslruction <br />Stendards and Specifications. <br />3. Call Location Underground Service AB hrs. belore you dig. TOLL FREE NUMBER 7-800•424•5555. <br />/DU�G/G LcJo,e.C".S� �'��i�i iC/oT �EqUii2�'�O <br />Approved for Construction <br />FINAL INSPECTION <br />Approved as Constructed <br />everett PUBLIC WORKS DEPARTMENT <br />� 3200 Cedar Street <br />Everet6 WA 98207 <br />Phone: 259•8815 <br />Date <br />/G �U-87 <br />�iGl,OJ <br />J <br />ACKNOWLEDGEMENT OF CONDITIONS <br />Thr, undersigned owner/applicant hereby ayrees to hold antl save harm• <br />less the City of Everett froni any and all claims for damages, costs, <br />expenses, or causes of aclion that may arise because ot insta�lation <br />and maintenance of the improvement or other right�of-way use hereto <br />applied tor and further agrees to remove same upon notice irom the <br />City and to replace public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PEFMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTEFl IS TO <br />BE DILIGENTLY PURSUED YO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />