My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1809 HOLBROOK AVE 2018-01-02 MF Import
>
Address Records
>
HOLBROOK AVE
>
1809
>
1809 HOLBROOK AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 12:44:18 PM
Creation date
2/20/2017 9:51:02 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLBROOK AVE
Street Number
1809
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-' TSE <br />• Engineering • <br />Date Sent: <br />06/21/01 <br />NAME: <br />Building Official <br />Total pages: <br />22 <br />From: <br />Terry Powell, P.E. <br />Subject: <br />Revised Plans <br />Project No.: <br />TSE #1930 <br />COMMENTS: <br />FAX <br />0� 5e�v <br />Gl�pe�m� <br />EXPIRES <br />JUN222001 <br />During construction the building has been modified from ifs original design. As a result several major <br />plan changes occurred which include but are not limited to: <br />a) a revised building plan which resulted in new shearwall and bearing well kxcations. <br />b) a revised floor framing plan. <br />c) a modified roof truss design . <br />d) a revised foundation plan developed by geotechincel engineer <br />Due to the plan changes rrentimed above, the original lateral and gravity load design for the building is <br />no longer accurate and a new structural design and plan review was required. The following report <br />includes revised structural calculations and plan changes for the new building configuration. <br />Lateral design: <br />Due to the revised building shape, and the modified truss design several of the key lateral engineering <br />romponents originally specified on the plan (drag trusses and shearwalls) were omitted. As a result a <br />new lateral design was developed. Please see stieet S 2 through 13 for revised calculations and shaft <br />18 thmugh 92 for lateral engineering plan changes. <br />Floor framing: <br />See sheet * 19 and 21 for revised framing plans. <br />Roof Framing: <br />All framing members above the wall top plates (except stick framing at bonus room) were designed by <br />the truss manufacturer. Please see truss engineering package for roof truss and beam design. See <br />sheets R 14 through 17 for bonus room framing calculation. <br />12810 N.E. 178th Street • Suite 101 • Woodinville, WA. 98072-8702 <br />(425) 481-6601 • FAX (425) 481-6371 • tristate@netos.com <br />(' D2- i <br />
The URL can be used to link to this page
Your browser does not support the video tag.