Laserfiche WebLink
Slone hockfill away from <br />foundation. — <br />TIGHTLINE ROOF DRAIN <br />Do not connect to footing drain. <br />BACKFILL <br />See text for VAPOR BARRIER <br />requirements. SLAB i_ <br />4' min. <br />WASHED ROCK" 6 min. ^' <br />FREE - DRAINING <br />NONWOVEN GEOTEXTILE SAND/GRAVEL <br />FILTER FABRIC <br />— 4" PERFORATED HARD PVC PIPE <br />Invert at least as low as fooling and/or <br />crawl space. Slope to drain. Place <br />weepholes downward. <br />{ FOOTING DRAIN DETAIL <br />GEOTECH 18XX HOLBROOK AVENUE <br />CONSULTANTS W i <br />EVERETT9 WA <br />.bD PNIt� <br />�" YY02E FEB tYOo N.T.S. 6 <br />