My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1809 HOLBROOK AVE 2018-01-02 MF Import
>
Address Records
>
HOLBROOK AVE
>
1809
>
1809 HOLBROOK AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 12:44:18 PM
Creation date
2/20/2017 9:51:02 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLBROOK AVE
Street Number
1809
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terhune Home Inc. <br />P.O. Box 8 <br />Mount Vernon, WA 98273 <br />Subject: Project: SHARMA <br />Job Address: 18XX Holbrook Avenue <br />Plan Check No: 60385 <br />Dear Mr. Bailey: <br />In response to your application for a construction permit, your plans have been <br />examined and you are advised that the issuance of a permit is being withheld for the <br />reasons listed below. These comments address building issues only, additional <br />revisions or additions may be required by other departments (such as Utilities, Planning <br />or Uniform <br />the <br />State of Washington and"or Washington <br />er to the State Energy Clodeg 97 Edition, unlessstated <br />otherwise. <br />In order for the processing of your application to continue, it will be <br />of necessary <br />rawinto gs reflectintheg the Building <br />Division <br />with <br />two complete new sets <br />1. Gas furnaces and gas water heaters shall not be located in rooms used for <br />sleeping. <br />2. Provide 1/10 of the floor area for natural light and 1/20 of the floor area for <br />natural ventilation. Bedroom N6 appears to be deficient in light and <br />ventilation. <br />3. Show size and placement of attic ventilation. <br />Prepare a response letter showing where each item in this correction letter is addressed <br />on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan <br />review will recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliance with all adopted <br />codes. <br />SincWeiln <br />Jeff <br />Development Technician <br />m:a<a�e,iMuum... rnwn..4k.1 nxwu <br />CITY OF EVERETT • 3200 Cedar Street 9 Everett, WA 98201 9 (425) 257-8800 9 Fax (425) 257.8656 <br />
The URL can be used to link to this page
Your browser does not support the video tag.