My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1522 HOLLOW DALE PL 2016-01-01 MF Import
>
Address Records
>
HOLLOW DALE PL
>
1522
>
1522 HOLLOW DALE PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:09:54 AM
Creation date
2/20/2017 9:51:48 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLOW DALE PL
Street Number
1522
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sevrer per City Stendard 11601. <br />O%Connect side sewer per City Stendard #'s 801, 602, 804. <br />�/ <br />7. Connect all roottop downspouts to the sids sewer. <br />� Connect roottop downspouts to the drainege system provided tor this lot. <br />9. Rooftop runoft must be discharged to a roof downspout infiltration system per City of Everett <br />Stortn Manual 3-2.6.2. Width _, Dapth � Length _ <br />iJ. A catch basin as per Ciry Standard Pian #402 with a gas t•ap per Standard Plan Ai410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per City of Evere:t Standerd Plan k's 305A <br />8� 306 on this proposal's frontage as directed by the Public Wor{cs Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the ._ Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity +low across t� �e public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainnge <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />IC,�ALL ��cs�Vd.-f�.� �`-tP�Tt'� ��� ��n'y� /=o��uc�aT7e� <br />/ 5� OE'ct-A(r�, D�1 �'e�..�� si-nYCL i3C H+1�1Ltr�� TO .4.0 <br />A'P�•2LL�c-v ,'�G=.2,� �; r��� '�, � /v'o „c.� .Fs�-�,v c, o� rn�1?L�'�.stL <br />o �I -4�i... r'�3U�[.GvNlj ,C.c? . <br />� S:, %' �:=n � � � r�� G� <br />, <br />� � <br />
The URL can be used to link to this page
Your browser does not support the video tag.