Laserfiche WebLink
� <br />�� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard N601. <br />��Connect side sewer per City Standard M's 801, 802, 804. <br />� <br />7. Connect all rooftop downspouts to the side sewer. <br />�8.1 Connect rooftop downspouts to the drainage system pravided for this lot. <br />� <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. A catch basin as per City S!andard Plan �402 with a gas trap per Standard Plan 1i410 is <br />required for the parking area. <br />17. Femove and replace curb, gutter and sidewalk as per City of Everett Standard Plan 1�'s 305A <br />8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from tha iront property line out to the street paving. <br />14. Contact the . Water District for connecting prov�sions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />f� ALL ��C.4Vta�t.� P-1 fk"[""C� t,�L E-j�G ry) /=0v4;c�•077eA <br />5� OC��t'AC.K, D�Z1 �'�<<-�z� �r-�'GL �'? C H«�-vl.�.�� To �ti' . <br />A-l���2L1.'�-z) ,�r'�2�»:-T��� '��� /�'o „c.�.ts,—c�.vc� CF i�'I�i?L-�//fL <br />C �1 -4-�u. t3viLC,Y�UL) .C.D , <br />awca�mwro ;Sa y �o ��m��L� <br />