My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1532 HOLLOW DALE PL 2016-01-01 MF Import
>
Address Records
>
HOLLOW DALE PL
>
1532
>
1532 HOLLOW DALE PL 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:41:57 AM
Creation date
2/20/2017 9:52:04 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLOW DALE PL
Street Number
1532
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />��, <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sevaer per City Standard ai601. <br />� Connect side sewer per City Standard k's 601, 602, 604. <br />7. Connect all roottop downspouts to the side sewer. <br />� Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rookop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manuat 3-2.6.2. Width _, Depth _, Length _ <br />10. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan #'s 305A <br />8 z06 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the �__ Water District for connecting provisions for this building's <br />water and sewer services. <br />15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potenHal drainage <br />routing priar to beginning the project. <br />17. A sprinkler system is required for this building in compliance with the requirements of NFOA <br />Standards 13D. , <br />(�Q� /�LL L-�Csk��.�.-rL-� r-t,��� �,�� �-z���� r=o���r�nc,� <br />-- � 5 i GE'at'AL�' . OC�1 b'�c�•<z -`+rfif'LG '"=C H+ll�l.l:1� io %�-ti` . <br />� � � '7�UC� CP �%%f%1L-X/•�iL <br />�}. J.�� �.��J /� G�i2i7 7: �T��J '� � i� /� C„<.� �!-S� <br />� <br />C �1 �u ���/LGy�L�C� �i.0 � , <br />��.�� / 5 3 Z<lo �� �`' i.k� L.�. /'/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.