My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1606 HOLLOW DALE PL A&B 2016-01-01 MF Import
>
Address Records
>
HOLLOW DALE PL
>
1606
>
1606 HOLLOW DALE PL A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 11:50:10 AM
Creation date
2/20/2017 9:52:08 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLOW DALE PL
Street Number
1606
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />/6./Connect side sewer per City Standard #'s 601, 6U2, 604. — / sfk� <br />C/ <br />7. Connect all rooftop downspouts to the side sewer. <br />Lr.�cl. (��,.l��a� <br />Z P� �.�+. <br />�8 konnect rooftop downspouts to the drainage system provided for this lot. <br />v <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per Ciry of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12�nstall erosion control measures per City of Everen Standards for small parcels <br />13. emove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />14. II excavated materiai from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City c� Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compiiance with the requirements of NFDA <br />Standards 13D. <br />PwCemmems I / ��/ � ��/� pw /1fy/� /�/ �/LL /i ,. <br />IA l0 F�TC��.. ���.. �c 7 �% <br />Z/�, <br />
The URL can be used to link to this page
Your browser does not support the video tag.