Laserfiche WebLink
f <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standsrd #601. <br />_�Connect side sewer per City Standard #'s 01, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />C'/ onnect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />91. lnstall erosion control measures 2s determined by the Public Works inspector, such as silt <br />��fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per City of Everett Sta�dards for small parcels <br />- 13.�R� emove erosion control measures upon completion of the project prior to final approval of the <br />/permit. <br />f4�.`All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allo��ad on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area musi be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity fiow across the public right-of-way, <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />avlccmnenis <br />��1 I �i� ��t� !�'d t.t/ �E3� �� � — � <br />