My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 HOLLOW DALE PL 2018-01-02 MF Import
>
Address Records
>
HOLLOW DALE PL
>
2020
>
2020 HOLLOW DALE PL 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 1:39:14 PM
Creation date
2/20/2017 9:54:19 AM
Metadata
Fields
Template:
Address Document
Street Name
HOLLOW DALE PL
Street Number
2020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSPECTION REPORT <br />n <br />Address <br />Contractor - -65 <br />LG�1�n Owner. � �c <br />Date <br />PPROVAL _ U PARTIAL APPROVAL <br />J VIOLATION ❑ CORRECTION REQUESTED <br />J Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange Ior appointment. <br />U Was not able to perform inspection. <br />❑ CALL 259.8810 FOR REINSPECTION — 24 hour notice required <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PRIOR TO OCCUPANCY. <br />TYPE OF INSPECTION REQUESTED <br />U Temp. Elect. <br />❑ Footing <br />U Framing J Gas Piping <br />❑Drywall, <br />Nailing <br />U Consultation <br />❑ Foundation <br />❑ Shear Nailing <br />U Groundwork <br />❑ Ductwork <br />U Grid <br />U Slruct. Slab <br />❑ Wood Stove <br />U Rough -in <br />Final <br />U Masonry <br />❑ Service <br />J Insulation <br />❑ Other <br />L <br />BLDG: Pmt. No. <br />AMECH: <br />Pmt. No. �i_ > <br />J ELEC: Pmt. No. U PLBG: Pmt. <br />
The URL can be used to link to this page
Your browser does not support the video tag.