Laserfiche WebLink
� � ;� ��JSTING JUN 1 5 1998 � <br /> CLOSSD CM WORR ORDBRS RBPORT <br /> Total Utility Maintenance Management System <br /> 11/21/1997 Page 1 <br /> ________________________________________________________________________________ <br /> Date Range : O1/09/1989 - 11/21/1997 <br /> CM Work Order Range :1001091070001 - UT2830-30-322Pattern :7101196649441 <br /> Item Range :<Blank> - WVL3694L05 Pattern : * <br /> Program ALL Function ALL Activity ALL <br /> ____________________________________________________________ <br /> -------------------- <br /> CM WORK ORDER ID: 7101196649441 Tit1P: SO .75 INCH 2O13 E GRAND A�IE <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function 119 Activity 664 <br /> Date Completed: 10/28/1997 <br /> Overall Craft : <br /> Issued: 07/14/1997 Issued by: Assigned to: <br /> Out of Service? NO Priority: Travel Time: 0 .00 Hr. <br /> Meter Reading: <br /> Downtime : 0 hours <br /> Status : <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> UL CSG CAVANAH, SHANE G. 0 . 00 3 . 00 42 . 39 <br /> WST LDS LOFLING, DELMAR S . 0 . 00 3 .50 76 .33 <br /> WST TDE1 THOMPSON, DWAYNE E. 0 . 00 3 . 50 67. 02 <br /> WST WDT WALDEN, DAROLD T. 0 . 00 3 . 00 63 . 69 <br /> Total Labor Cost: 249 .44 <br /> Materiale: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITEU 10/28/1997 1 8 . 38 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 10/28/1997 1 12 . 94 <br /> CORP34001847 CORP STOP 3/4" CCT X INSTA O 10/28/1997 1 15 . 34 <br /> ELL034104247 ELL 3/4" 90 DEG STREET BRASS " 10/28/1997 J. 1 . 51 <br /> METE36089447 METER 5/8" X 3/4" NEPTUNE T-10 10/28/1997 1 30 . 67 <br /> PIPE34060647 PIPE 3/4" POLY I .P.S. 10/28/1997 65 12 .35 <br /> SADD44016847 SERVICE SADDLE 6" W/3/4" CCT 10/28/1997 1 12 . 01 <br /> SETT34033647 SETTER COP 5/8" X 3/4" (H12" ) 1C/28/1997 1 52 .31 <br /> Total Material Cost : 145 . 51 <br />� Vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V2119 91 CHEV 5 YD 3 . 00 32 .40 <br /> VH0003 94 CAT BACKHOE 3 . 00 72 . 60 <br /> VJ0026 ' 97 FORD 1 TON SVC TRUCK 3 . 50 20 . 65 <br /> Total Vehicle Cost : 125 . 65 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br />