Laserfiche WebLink
INSPECTION REPORT : <br />� � � / � <br /> Address �—�2/ i �_ <br />( Contractor __ - <br /> �1� �' Owner <br /> � Date 7 ��� <br /> PROVAL �l PARTIAL APPROVAL <br /> U VIOLATION U CORRECTION REQUESTED <br /> U Corrections listed below MUST BE MADE before work can be approved. <br /> ❑Please contact inspector and arrange for appointment. <br /> J Was nol able to peAorm inspection. <br /> U CALL 259-8810 FOR HEINSPECTION–24 hour notice required <br /> A CE FICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON PREMISE IOR TO OCCUPANCY. <br /> Inspector Date— — <br /> OF INSPECTION RE�UESTED <br /> �� emp. Elect. J Framing �J Gas Piping <br /> J Footing U Drywall, �ailing U Consultation <br /> ❑ Foundation ❑Shear Nailing ❑Groundwork <br /> 0 Duciwork J Grid U Slruct. Slab <br /> U Wnod Srove U Rough-in ?�inal <br /> J Masonry ❑ Service � Insulation <br /> ❑ome� <br /> J�BrDG: Pmt. No.'l �2[��MECH:Pml. No. <br /> ❑ELEC: Pmt.No. J PLBG: Pmt. No. — � <br />