Laserfiche WebLink
. � �- <br /> Comment#13: <br /> Shuctural calculations, plans and details have been provided to indicate all loads and traced to the <br /> foundation. <br /> Comment N14: <br /> New stair stringers will be supported by (3)2x8 joists added to existing main floor framing See sheet A-5. <br /> CommE nt#15: <br /> The toilet room has been adjusted slightly to allow for the headroom clearance required by the new floor <br /> joists which support the wall. <br /> All revisions have been clouded and marked with a revision triangle(#1) <br /> New structural calculations supporting new sheets S1, S2 and S3 are being submitted for review. <br /> ,�1 <br /> �i�;' <br />