My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1212 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1212
>
1212 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 3:44:20 PM
Creation date
2/20/2017 3:44:03 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1212
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 31, 2008 <br /> Mr. Paul Tessier <br /> L&A Job No. 8A027 <br /> Page 16 <br /> RISK EVALUATION STATEMENT <br /> The site is underlain at shallow depth by dense silty stjnd and hazd fine sandy silt soils. These <br /> soils are of high shcar strength in their native undisturbed state and have excellent resistance <br /> against slope failures. 1'roper erosion and drainage control is key to maintain site stability. lt is <br /> our judgment that provided the recommendations in this repori are fully implemented and <br /> observed during construction, the areas disturbed by construction activities will be stabilized and <br /> remain stable and will not increase the potential for soil mo�ement. It is our opinion that the risk <br /> of dumages to the proposed development and Gom the development to adjacent properties due to <br /> soil instability should bc minimal. <br /> LIMITATIONS <br /> This report has bcen prepared for the specific application to the subject project for the exclusive <br /> use by the Mr. and Mrs. Paul Tessier and thcir associates, consultants, and contractors. We <br /> recommend that this report, in its entirety, bc included in thc project contract dceuments for the <br /> information oC thc prospcctivc contractors for thcir estimating and bidding purposes and for <br /> compliance with the rccommendations in this rcport during construction. The conclusions and <br /> interpretations in this rcport, howcver, should nol be construcd as a warmnty of the subsurface <br /> conditions. 7'he scope of this swdy docs not incluJe services related to cnnstruction safety <br /> precautions and our rccommcndations are not intended to direct the contractor's methods, <br /> techniqucs, sequ�nccs or procedures, except as s�citically described in this report for design <br /> considerations. <br /> Our recommcndations and conclusions arc based on geologic and soil conditions indicated on the <br /> above-refcrcnced gcologic map and the soil conditions observed on the udjacent Reference Site, <br /> our engineering analyses, and our expr;rience and engineering judgmenl. The conclusions and <br /> LlU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.