My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1525 GRAND AVE 2016-01-01 MF Import
>
Address Records
>
GRAND AVE
>
1525
>
1525 GRAND AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2017 4:58:16 PM
Creation date
2/20/2017 4:58:12 PM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
1525
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ �vd��c `trv��xs �� ' <br /> Novero�er�l, <br /> Horiwn Construction Company <br /> PO Box 1378 <br /> Marysville, WA 98270 <br /> Subject: Owner: Gruenberg <br /> Job Address: 1525 Grand <br /> Plan Chxk No.: 53518 <br /> Deaz Mr. Belanich: <br /> Inr�po nse to your a�plicadon for a �ronstruction pennit, your plans have been examined and you <br /> are advised that the issuance of a permit is being withheld for the reasons listed below. These <br /> comments address buiiding issues only, addidonal revisions or addifions may be required by other <br /> departments (such as U6lides, Planning or Fu�e). A1l references refa to the 1994 Uniform Building <br /> Code, as amended by the State of WashmgWn and/or Washington State Energy Code 1995 Gdi6on, <br /> unless stated otherwise. <br /> In order for the processing of your application to continue, it will be neces.w�ry to <br /> provide the Building Divis�on with two oomplete new sets of drawings refleding <br /> fhe corredions requested. <br /> 1. The carport as shown does not mcet the prescripdve re4uirements for lateral bracing per <br /> Secdon 2326.4 UBC. Provide details and/or calculaUons showing how this structuro <br /> meets the requirements for lateral bracing. <br /> 2. Specify type of connector used at: <br /> a, post to footing <br /> b. post to beam <br /> c. trusses to beams <br /> 3. Provide minimum 15 pound builders felt under composidon shingles. <br /> 4. Spocify species and grade of lumber (posts and beams). <br /> Prepare a response letter showing where each item in this correction letter is addressed on the plan <br /> set. <br /> Upon resubmittal of the drawings, your application will be given priority and plan review will <br /> rocommence. <br /> All required submittals shall be of sufficient detail and wntain sufficient informaflon to ensuro that <br /> the proposed structure will be constructod in compliance with all adopted codes. <br /> Sincerely, <br /> ��.���.�- <br /> Jeff Hei an <br /> Development Technician <br /> 1N:jW„.�apek.)) <br /> CITY OF EVERETT•3200 Cedar Street• Everett,WA 98201 • (206)259-8800• Fax (206) 259-8858 <br />
The URL can be used to link to this page
Your browser does not support the video tag.