Laserfiche WebLink
( <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> �-�, <br /> �6, ConneN all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> B. Rooftop runoff must be discharged to a roof downspoul infiltration syctem per City of Everett Slorm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet�vith the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. <br /> 10. install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for s��all parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> C13\ All excavated material from foundation, sidewalk and driveways shail be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lol. <br /> i � <br /> �4. Mo dirt, mud, rocks or debris to be tracked onto roadway. <br /> ta AICFy ,�1L[s� <br /> �15. No building materials to be stacked on-sidewe{ks and sidewaUcs to be kept ciean and open for <br /> �ed�strian travel. <br /> �; t �; ��. <br /> 1 G. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A 8 306 on <br /> lliis proposal's frontage as directed by the Pubiic Works Inspeclor(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Inslall a Type I concrete driveway per City of Everett Slandard #307. <br /> ---�� <br /> .C�,�9,�-_��ave.dnve�v�rom prepedklinev& fi�stre �a iqg. <br /> "�r—' \ <br /> 20. Contact the Water District tor connecting provisions for this building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan tW02 wilh a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be inslalled, the pressure line must discharge into a private manhole, then <br /> c�ravity flow across the public right-ef-way. <br /> 23. A sprinkler syslem is required for this building in compliance wilh the requirements of NFDA Standards <br /> 13D. <br /> � <br /> PIYComments <br />