Laserfiche WebLink
r � � � <br /> , <br /> � November 10, 2000 (3-1266 <br /> IGillette Residence Page 9 <br /> discharge point. We recommend that sufficient cleanouts be installed at strategic locations to <br /> allow for periodic maintenance of the footing drains and downspout tightlines. <br /> I 6.0 LIMITATIONS <br /> This report has been prepared for the specific application to this site for the exclusive use of Port <br /> Gardner Architects and its authorized representatives. We recommend that this report be <br /> I included in its entirety in the project contract documents for reference during consttuction. Use <br /> of this report by other parties is solely at their own risk. <br /> � <br /> � Our findings and recomnendations stated herein are based on field observations, our experience <br /> and judgement. The recommendations are our professional opinion derived in a manner <br /> consistent with the level of cere and skill nrdinarily exercised by other members of t}�e profession <br /> currently practicing under similar conditions in this area and within the budget constraint. No <br /> warranty is expressed or implied. In the event the soil condition vary during site excavation, Geo , <br /> Group Northwest, Inc. should be notified and the above recommendations should be re-evaluated. i <br /> 7.0 ADDITIONAL SERVICES <br /> IWe recommend that Geo Group Northwest Inc. be retained to perform a general review of the <br /> I final construction plans and speci6cations for the proposed development to verify that our <br /> geotechnical recommendations have been properly interpreted and incorporated into the <br /> documents and are appropriate for the finalized design nf the proposed development. <br /> IWe also recommend that Geo Group Northwest Inc. be retained to provide monitoring and <br /> i testing services for geotechnically-related work auring constniction. A Geo Group Northwest, <br /> Inc., representative should observe geotechnically-related construction work for complisnce with <br /> � the geotechnical recommendations in this report, and should be available to discuss and <br /> recommend design changes, if needed, in the event substance conditions differ from those <br /> anticipated prior to the start of construction. <br /> I <br /> IGeo Group Northweat, Inc. <br /> I 4�1H <br />