Laserfiche WebLink
J U L. 1 6 — '3 :< T 1�1 l.1 9 . .+ A �G L� C o �'� o i+ I 6 1 r� a E n 9 I r� � +� r s P . 0 2 <br /> 16�0•t10th Ar�nue N.F, � SuHe 201 ^ <br /> Osll�vw • W�ehM�foe • A8005 <br /> ctoeJ i�r•asu2 • Ftix (2om t�t•s�e+ <br /> p 0 N 5 U � T I N Q E N 0 I N E E R S <br /> JOB SITE OBSERVA710N FIEPORt #3 � <br /> bATE: July 15, 1993 JOB NO: 90124 <br /> JO� NAME: Westchoster BY: Bill Armour <br /> TIMF: 7:30 A,M. REPORT FOR: Mr. Mitch Shoemaker <br /> Newland Constructlon <br /> pESCRIPT10N: <br /> Fieid visit for general review o} tlie roof diaphragm and related connections. <br /> ! COMMEN7S: <br /> 1- In qenerai the roof has been constructod according io 1he plans and details, <br /> r 2. parli ular the naing which wll b co�e ed by crick ts is oi�the correicgspacing. <br /> �� The sloped sheathing needs to bo nailed to the to� of the parapet wall wiih 10d at <br /> 6" U.C.. <br /> q. 'fhe vortical shoathing on the parapot wali had not been installed at the time of the <br /> ' sfte visit. � - � � <br /> i <br /> 6- Tho nailing between the horizon�al and vertical blocking at the boflom of the <br /> parapet wall requires a minimum ot 16d at 6" o.c,. The nailing which had been <br /> : provided w�s not correctly spaced and additional nails arv requirec}. <br /> 6. blocking overl tliol suppoRlw Ils a mibetum of o�ery other bay must be sheiatlief d or <br /> ' , <br /> ' cross bracod. <br /> I <br /> 7- The holdown straps had not been insta1l�d at tl�e timo of iho si�� visit. <br /> �enorel Comment <br /> • Mitch Shoemaker o( Newland Construction was al lhe site at the time of the site <br /> visit and was made aware ot the above discrepancies and assured me that ;hoy <br /> would be corrccted. <br /> • STRUCTtlRAL � TRANSPORTATION • <br /> • CIVIL _ - ' <br /> c�a5 0 ' <br /> REiC:�:E: FRVN i-0 ,"��i.1 . ' • 1:'. . - . •� <br />